|
Environmental Engineering Associates
|
|
The Onsite Wastewater Disposal Trend Setter
|
|
Often on the cutting edge of onsite technology in order to better serve
their clients, EEA and it's principal, Storm Goranson, P.E., R.E.H.S. - former State Regional Water Quality Control Board staff engineer and County health inspector, have long been with the design, construction, repair, and operation of septic systems for the past thirty years in the Greater Bay Area. Some of their technological firsts are listed below. |
|
-- Prepared grant document and attained State approval for the first septic
system management district in the State, as well as serving as the
original plan reviewer (Stinson Beach - 1980).
|
|
-- Installed the first individual aerobic wastewater treatment system (Cotati -
1997).
|
|
-- Installation of the first residential aerobic wastewater treatment systems in
the following Counties and Jurisdictions: Sonoma (1997), Stinson Beach
(1999), and Contra Costa (2000).
|
|
-- Design and Installation of the first Geoflow drip irrigation system for the
disposal of single residential wastewater in the State (Sonoma County -
1997).
|
|
-- Design and installation of the first shallow, gravel-less pressure distribution
system (Stinson Beach - 1999).
|
|
-- Design and installation of the first gravel-less leachfield systems in the
following Counties: Contra Costa (1999) and Marin (2000).
|
|
-- The repair of the largest septic system, serving 200 residential units, in the
Bay Area (Contra Costa - 2000). |
|
-- Planning, State approval, and preliminary design of the second largest
residential project in the Bay Area(35 homes) utilizing a community
onsite wastewater disposal system (Marin - 1997).
|